Polypoles was tasked with maintaining a minimum of 5° in a 5-storey building under construction.
Water infiltration at roof level on a new 1365M² winegrowing building.
To store spare parts in a marquee and prevent them from deteriorating over the winter period.
Since 2019, we have been providing temporary heating services for two major structures
A pharmaceutical manufacturer in Aquitaine urgently needed to install a positive cold room to store products at a controlled temperature of 5°C.
